We want to make known as objectives the scope and scope of the requirements established in this Law, as well as the interpretative criteria of the Certifying / Verifying Entity.
This conference will be given by Mrs. Montserrat Freixas Mercadé, Head of the Department of the Environment ICICT SA
PROGRAM
1. Introduction
2. Administrative intervention regime
3. Classification of activities
4. Routes for the incorporation of activities into the new law
5. Documentation to be processed to adapt the activity to the law
6. Content of the technical project
7. Processing of the file: environmental authorization scheme? (I), (II), (III), (IV)
8. Verified environmental assessment
9. Control system
10. Scope of the control action
11. Environmental control entity (EAC)
12. Purpose of environmental control
13. Modalities in which initial control can be made
14. Delay of the EAC in the control performed
DATE AND TIME: May 27, 2004 from 6:30 p.m. to 9:00 p.m. (approximately)
RATIONALE PLACE: Dr. University Center Manyà, Camí de Betània, 5 de Tortosa
DOCUMENTATION: This will be accompanied by the practical guides of the law 3/1998: Prevention system (yellow guide) and Technical documents associated to procedures (blue guide) along with an informative dossier prepared by the company ICICT SA
MAXIMUM NUMBER OF ASSISTANTS: 10/20 attendees
REGISTRATION TERM: Up to the maximum number of attendees.
CONFIRMATION OF ASSISTANCE: It is necessary to confirm attendance at the administration of the College at tel. 977 251 877 or 902 076 777, and if you prefer, you can do it through the new form@cetit.org (your registration will not be effective until you receive confirmation from the College).
FREE REGISTRATION
Conditions: |