Canvas Logo

[POSTGRADUATE On line streaming] SAFETY ENGINEER IN CHEMICAL RISK.

Organized by: Barcelona Association of Graduate Engineers and Industrial Technical Engineers (ENGNYERS BCN) with the collaboration of ENGINEERS TARRAGONA
Aimed at: This Postgraduate is intended for staff of HSE departments of companies, prevention technicians and engineering departments.
Dates: Start September 28, 2021 (Tuesday) until March 29, 2022 (Tuesday)
Duration: 166 hours
Programming:

MODULE 1: APQ REGULATION: INTRODUCTION AND STRUCTURE OF THE RAPQ

  • How to know the application of the APQ regulation on the basis of the CLP Regulation.

Classification of hazardous substances and mixtures. CLP Regulation.

Interpretation of SDS.

Application thresholds and calculations with the weighted sum.

Chemical compatibility studies, required in the application of the APQ.

  • History of the APQ and explanation of the interpretive guide of RD656 / 17.

History of the APQ.

Main news new APQ Regulation - RD656 / 2017

Regulation structure, ITC, general part, type of facilities of each ITC.

ITC MIE APQ-0: General definitions.

ITC MIE APQ-01 to 10: Main modifications new RAPQ.

Interpretive sheets of the Guide.

MODULE 2: APQ AND INTERACTION WITH OTHER REGULATIONS

  • ATEX knowledge for chemical storage design.

Introduction to ATEX regulations.

Classification of the aerials of a storage.

Preventive measures.

Risk assessment.

Facilities design.

  • Justification of the RSCIEI in the new APQ.

Main news.

RSCIE versus APQ.

What to keep in mind when designing an APQ warehouse.

High Risk Flammable Warehouses in Type A or B Buildings. As faced by the APQ.

SCI calculations in APQ1.

  • APQ and the Self-Protection Plan.

How to define PEACE.

Application regulations based on the APQ.

Carrying out the chemical risk analysis.

Definition of action protocols.

Communication of emergency situations.

Necessary means for the implementation of the PAU.

MODULE 3: REGULATIONS ASSOCIATED WITH THE RAPQ

  • Main differences between APQ- * ADR- * IATA- * IMDG.

Scope of application of the transport regulations of MMPP. ADR is not the same as APQ.

Classification of dangerous goods for transport.

Labeling for transport.

The figure of the Minister of Security in the APQ. Responsibilities.

Loading and unloading procedures.

Necessary security measures according to the ADR.

  • APQ and SEVESO.

Introduction to serious accident regulations.

Main differences with the APQ Regulation.

Not all products to which APQ applies are applied by AG.

Seveso is not just storage, it is process.

Risk analysis in processes: HAZOPS, What if, etc.

Needs to comply with AG regulations.

PSM development.

  • APQ and Environmental Liability Act.

Containment of contaminated water.

Volume calculation.

Design of preventive measures.

Reduction of environmental costs.

Financial guarantee - ARMA - Third party liability policy.

MODULE 4: RAPQ - REVISIONS, TRAINING AND MANAGEMENT SYSTEM

  • Know what types of facilities are those described in RD 656/2017, what inspections and revisions required by Royal Decree and ITC. Know the points to be evaluated as your own inspector.

Control of facilities, maintenance plans.

Initial and periodic inspections.

Periodic reviews. What needs to be reviewed? Check list. Final certificate.

Five-year inspections of surface tanks. Metal and plastic tanks.

Tightness tests in buried tanks and pipes.

Own inspector: training and appointment.

How to face a five-year regulatory inspection by a Control Body accredited by ENAC. Rights and duties.

  • Develop the necessary training plan for personnel handling chemicals in warehouses subject to the APQ Regulation, to strengthen the concepts of classification, labeling, storage and management of accident prevention, related to hazardous products or substances.

Properties of stored liquids:

Classification and labeling of hazardous substances.

Storage of hazardous substances: incompatibilities

Differences in classification of hazardous substances and preparations according to handling, storage, serious accidents and ADR.

Function and correct use of the elements and installations of Security and of the equipment of personal protection.

Prevention and mitigation measures. How to protect yourself and what to do with it?

Consequences of incorrect operation or use of the elements and facilities of Security and personal protective equipment.

Action in case of leaks or spills.

Action measures in the event of a spill

Procedure in case of fireHow to act according to the type of product dumped?

How to prepare a dumping drill.

How to make the simulation report and take advantage of your study.

  • Introduction to Process Safety Management - SM

What is a PSM

How it develops.

System structure.

Study of the UNE192001 standard.

Advantages of its correct implantation for the reduction of the risk.

More information: HERE
Documentation: The documentation will be available on the platform between 24 and 48 hours before the start of the training. In the event that there is additional documentation after the training, we will provide it later.
Note:

This postgraduate course allows enrollment in the full syllabus and enrollment in independent modules is also allowed.

For registration in Module 4, it is an essential requirement to have previously completed Modules 1, 2 and 3.

The maximum grace period to continue with the rest of the Modules is 2 years. After this time, it will not be possible to continue with the missing modules but it will be necessary to start again (due to the evolution of the subjects)

Information session:

There will be an information session on September 14 (Tuesday) at 5 p.m.

Conditions:

Unsubscribe:

Depending on the registrations made, the training action will be viable or not, which is why it is important that you notify the cancellations.

The cancellation must be communicated 48 hours before the start of the training via e-mail formacio@cetit.org, if 100% of the amount of the training action will not be invoiced.

Images and recording of the course: we inform you that, in compliance with the provisions of the RGPD, the current legal regulations on data protection and Law 1/1982 on civil protection, the right to honor, personal and family privacy and the image itself, photographs will be taken during the course and in certain cases will be recorded and / or broadcast live. Under no circumstances will the name of the interested party be published. The image is used legitimized by the legitimate interest of the College to promote these courses and their possible subsequent viewing by the attendees.

Due to attendance, these images will be kept and while the course is uploaded to the platform. Once the time has elapsed to be able to view it later, it will no longer be uploaded to the platform and the images will be deleted with the appropriate security measures.

You also have the right to request access, rectification, portability and deletion of your data and the limitation and opposition to its processing by sending an e-mail to dpd@cetit.org. For more information on data protection rights, access our website: http://www.enginyerstarragona.cat/home/article/privacitat.