Canvas Logo

[COURSE] NEW ACCESSIBILITY CODE OF CATALONIA DECREE 209/2023. Online mode.

Addressed to: Project engineers, project management managers, builders, installation and maintenance companies for photovoltaic installations.
Dates: 23 (Wednesday) and 24 October (Thursday) 2024
Schedule: From 3:00 p.m. to 8:00 p.m
Duration: 10 hours
Place:

At the CETIT facilities, Av. from Rome, 7 from Tarragona.  

Targets: Agricultural, livestock, forestry and rural farms often have access to a complex and expensive electrical distribution network. Self-consumption installations present a viable solution to this kind of situation. In this course, the necessary knowledge will be acquired for the design of water pumping installations through self-consumption of electricity, developing hydraulic and photovoltaic concepts and installations.
Programming:

1. BLOCK I: DEFINITION OF SOLAR PUMPING.

• Definition.

• Advantages and disadvantages of solar pumping installations.

• Type of solar pumping according to pump.

2. BLOCK II: GENERAL CONCEPTS.

3. BLOCK III: HYDRAULIC.

• What is a hydraulic pump?

• Helicoidal pumps.

• Centrifugal pumps.

• Main differences between helical and centrifugal pumps.

• Differences between submersible and surface pumps.

• Hydraulic power, electrical power and mechanical power.

4. BLOCK IV: TYPE OF PUMPING.

• Shallow pumping.

• Pumping with direct irrigation.

• Pumping to irrigation basin by gravity.

• Common photovoltaic field.

• Hybridization direct-low irrigation.• Hydraulic hybridization.

• Electric hybridization.

5. BLOCK V: SOLAR RADIATION.

• Definition and type.

• Irradiance and irradiation.

• Solar constant.

• Air mass losses.

• Trajectory of the sun. solar cards

• Optimum orientation and inclination of panels.

• Tables of irradiance and irradiation. simulations

6. BLOCK VI: ELEMENTS THAT MAKE UP A SOLAR PUMP WITH FREQUENCY VARIATOR.

• Photovoltaic modules.

• Structures.

• Frequency converter.

• Hydraulic pump.

7. BLOCK VII: SOLAR PUMPING WITH SOLAR PUMPS.

• Solar pump calculation with solar pumps.

• Solar pumping with GRUNDFOS.

8. BLOCK VIII: DIMENSIONING SOLAR PUMPING WITH FREQUENCY VARIATOR .

• AC pump sizing.

• Dimensioning frequency variator.

• Dimensioning of the photovoltaic field.

9. BLOCK IX: DIMENSIONING SOLAR PUMPING WITH SISYPHUS.

10. BLOCK X: CALCULATION OF SECTION OF CABLES AND PROTECTIONS.

11. BLOCK XI: ASSEMBLY AND MAINTENANCE OF THE INSTALLATIONS.

12. BLOCK XII: ELECTRICAL DIAGRAMS OF SOLAR PUMPING INSTALLATIONS. EXAMPLES

13. BLOCK XIII: POSSIBLE PROBLEMS IN SOLAR PUMPING INSTALLATIONS.

Documentation: The documentation will be available on the platform between 24 and 48 hours before the start of the training. In the event that there is additional documentation once the training is completed, we will provide it to you later.
Certification: Once the training has been completed, students will receive a certificate of attendance that can be downloaded from the platform.
Bonuses: We manage the procedures so that you can benefit from the corresponding training bonus.
Bonus instructions:

1. Request the forms from the CETIT at formacio@ingenijerstarragona.cat

2. Provide all the information 10 calendar days before the start of the course.

3. IMPORTANT NOTE: Bonuses are carried out through an external consultancy.

Those who wish to take advantage of the bonus for any training action, the price will be increased by 20% (which can also be bonused and recovered).

Conditions:

Cancellation of registrations:

Depending on the registrations made, the training action will be viable or not, for this reason it is important that you notify cancellations.

The cancellation must be communicated 48 hours before the start of the training through the email formacio@cetit.org, otherwise 100% of the amount of the training action will be invoiced.

Images and recording of the course: we inform you that, in compliance with the RGPD, the current legal regulations on data protection and Law 1/1982 on civil protection, right to honor, personal and family privacy and the image itself, photographs will be taken during the course and in certain cases they will be recorded and/or broadcast live. Under no circumstances will the name of the interested party be published. The image is used legitimately for the College's legitimate interest in promoting these courses and their possible subsequent viewing by attendees.

By attending, these images will be kept as long as the course is uploaded to the platform. Once the period for viewing it later has passed, it will no longer be uploaded to the platform and the images will be deleted with the appropriate security measures.

Likewise, you have the right to request access, rectification, portability and deletion of your data and the limitation and opposition to its treatment by sending an email to dpd@cetit.org. For more information on data protection rights, access our website: http://www.ingenijerstarragona.cat/home/article/privacyt.

Speakers

  1. ROBERTO LEDO CAVAEnginyer Tècnic Industrial especialitzat en Electrònica Industrial. Professionalment, em vaig especialitzar en el sector fotovoltaic (autoconsum, instal·lacions fotovoltaiques aïllades i bombament solar). CEO i fundador de RenoblEx Enginyers, empresa especialitzada en la formació en instal·lacions fotovoltaiques.