Canvas Logo

NEW REGULATIONS FOR COMPLIANCE WITH PERMANENT OVERVOLTAGE



CIRCULAR CODE: 10/30

A technical business day has been organized on the NEW REGULATION OF OBLIGED COMPLIANCE OF PERMANENT OBLIGATIONS . PROTECTION AGAINST THE BILL AND THE OBSERVATIONS. , which will be carried out by the company CIRPROTEC.

PROGRAM OF THE DAY:   

Presentation CPT - Cirprotec: A solution for each installation

External protection - Lightning arresters

2.1. Regulatory Area

2.1.1. Antecedents

2.1.2. Technical Building Code (SU8)

2.1.3. Building calculations

2.1.4. Levels of Protection

2.2. Protective Methods

2.2.1. Franklin tips or pickup tips

2.2.2. Rolling sphere

2.2.3. Lightning rods with priming device

2.3. The formation of lightning

2.4. How does a lightning bolt work?

2.5. How to perform an installation of lightning bolts

2.6. Maintenance of the installation

Overvoltages

3.1. Types of overvoltages

3.2. Overvoltage regulations

3.2.1. NEW NORMATIVE of permanent overvoltages

3.2.2. Article 16.3 of the REBT

3.2.3. ITC-23 of the REBT

3.2.4. ITC-23 Guide

3.2. Transient overvoltages

3.2.1. Causes that cause transient overvoltages

3.2.2. Types of protectors and how they act

3.2.3. How to install overvoltage protectors

3.3. Permanent overvoltages

3.3.1. Causes that cause permanent overload

3.3.2. Types of protectors and how they act

3.3.3. How to install overvoltage protectors

Cirprotec Solutions

CALENDAR: April 28 at 6 pm.

SPEAKERS : Josep Soler, commercial manager of the area of Catalonia and Pedro A. Ramírez, marketing of the area of Catalonia.

PLACE: At the CETIT headquarters, Av. of Rome, 7 of Tarragona and transmitted by videoconferencing to the facilities of Terres de l'Ebre, Mercaders street, 2 of Tortosa.

REGISTRATION TIME: until the maximum capacity of the Assembly Hall is completed.

FREE REGISTRATION

Conditions: